Case study
Commonwealth War Graves Commission (War Cemetery)— Chittagong Hybrid Solar
A heritage-site hybrid solar system with zero visual intrusion, audited by the British Embassy — renewable energy meets irreplaceable history. Their Main pain point was repetitive Diesel Generator failure, frequent maintenance and operational delay. For maintaining zero interrupt during high level Corporate meeting with London, we implemented Hybrid Solar with LFP Battery Backup.
- Sector
- Heritage & Cultural
- Location
- Chittagong
- Scale
- 10kWp with 10kWh LFP Battery
- Year
- 2024
_Transparent-1.webp&w=1440&q=75)