Solar & Renewable Energy
Bangladesh's trusted solar EPC partner — on-grid, off-grid and hybrid PV from 1 kWp to utility scale with Growatt inverters, JA Solar / Jinko panels, net metering, PPA and rooftop-lease options.
What's included
On-grid, off-grid and hybrid solar EPC from 1 kWp to utility scale — site assessment, system design, supply of quality components (Growatt inverters, JA Solar and Jinko Tiger-Neo N-type panels), installation, testing, grid-tie commissioning and performance monitoring. Sustech also offers PPA (Power Purchase Agreement) and rooftop-lease models for zero-upfront solar adoption.
Reference projects include WFP Bhashanchar, Commonwealth War Graves Commission in Chittagong, Eastport Cumilla (100 kWp), and CUET — spanning industrial, humanitarian, heritage and institutional sectors.
Solar energy is the foundation of Sustech's commitment to clean, cost-effective power for Bangladesh's industrial sector — reducing grid dependence, lowering electricity costs, and contributing to national renewable energy targets.
Standards & methodology
PV systems are engineered to IEC 61215 / 61730 (modules), IEC 62548 (array design) and IEC 60364-7-712 (PV installations), in line with BNBC and DESCO/BPDB net-metering requirements. All installations comply with SREDA guidelines for grid-connected systems in Bangladesh.
Proof
Related projects
- Garments & RMGVanguard Dress / BSA Group — Turnkey FactoryFull factory wiring, a new substation and rooftop solar — delivered turnkey, complete from first conduit to final lux reading.
- Industrial & ChemicalEastport Cumilla — 100 kWp On-Grid Solar EPC100 kWp on-grid solar EPC with Growatt inverters and JA Solar panels — full EPC from design to commissioning, from drawing to kWh.
- Academic & TVETCUET Rooftop Solar ( Uploading .......)University rooftop solar for Sustech's oldest institutional client (since 2021).
- Heritage & CulturalCommonwealth War Graves Commission (War Cemetery)— Chittagong Hybrid SolarA heritage-site hybrid solar system with zero visual intrusion, audited by the British Embassy — renewable energy meets irreplaceable history. Their Main pain point was repetitive Diesel Generator failure, frequent maintenance and operational delay. For maintaining zero interrupt during high level Corporate meeting with London, we implemented Hybrid Solar with LFP Battery Backup.
Frequently asked questions
- How long does a 50 kWp system take?
- Typically a few weeks from design to commissioning, depending on site readiness and net-metering approval.
- What is the ROI on solar in Bangladesh?
- Most industrial rooftop systems pay back within a few years through grid-electricity savings — we provide a feasibility report with your numbers.
- Do you handle DESCO/BPDB net-metering?
- Yes — our scope covers design, documentation and coordination through to net-metering and grid-tie commissioning.
Planning a solar & renewable energy project?
Tell us what you’re building — our engineers will scope it with you, no obligation.