

Service
BESS & Energy Storage
Lithium (LFP) battery energy storage from 100 kWh to 1 MWh+ — load-shifting, peak-shaving, backup and microgrid stabilisation. Bangladesh agent for Hithium LFP storage with Hero2 UPS integration.
BESS & Energy Storage explainer video
See it in action
Animation for illustration. Real installations are engineered to your site and standards.
What's included
Lithium (LFP) battery energy storage from 100 kWh to 1 MWh+ industrial cabinets, plus Hero2 UPS — for load-shifting, backup, peak-shaving and microgrid stabilisation. Sustech is the Bangladesh agent for Hithium LFP storage, supplying and commissioning utility-grade BESS for industrial and commercial clients.
BESS applications include: reducing peak demand charges (peak-shaving), storing solar energy for night-time use, providing seamless backup power, and stabilising weak-grid or off-grid microgrids. When paired with solar PV, BESS creates true energy independence — up to 90% reduction in grid dependency.
Reference: WFP Bhashanchar 16 kWh BESS, CWGC hybrid solar+storage system, and industrial peak-shaving installations across Chattogram.
Standards & methodology
BESS uses LFP chemistry for safety and long cycle life, integrated to IEC electrical-installation standards. Systems are designed with thermal management, BMS (Battery Management System), and remote monitoring capabilities for reliable industrial operation.
Proof
Related projects
- NGO & UN AgenciesWFP Bhashanchar Substation250 kVA + 200 kVA substation, a 110 kW generator and a 16 kWh BESS for a UN humanitarian island facility — UN-grade reliability where the grid is the last resort.
- Heritage & CulturalCommonwealth War Graves Commission (War Cemetery)— Chittagong Hybrid SolarA heritage-site hybrid solar system with zero visual intrusion, audited by the British Embassy — renewable energy meets irreplaceable history. Their Main pain point was repetitive Diesel Generator failure, frequent maintenance and operational delay. For maintaining zero interrupt during high level Corporate meeting with London, we implemented Hybrid Solar with LFP Battery Backup.
Frequently asked questions
- LFP vs lead-acid — which is better?
- LFP offers far longer cycle life, higher usable depth-of-discharge and a smaller footprint — a better total cost for industrial use.
- What sizes do you supply?
- From 100 kWh to 1 MWh cabinets, sized to your load profile and backup goals.
Planning a bess & energy storage project?
Tell us what you’re building — our engineers will scope it with you, no obligation.
_Transparent-1.webp&w=1440&q=75)
